Laying track for the wall framesBuilding Interior
CMU (block wall) installation at the detention areaDetention Area
Digging for the Joint TrenchJoint Trench
Forming concrete curbs on Antoinette LaneJoint Trench
Install CMU Block Wall @ Detention AreaDetention Area
Installing overhead coiling door framesSupport Building
Framing for Exterior WallsPolice Building
Installing fire sprinkler linesBuilding Interior
Prepping for reinstalling sidewalk on Antoinette LaneSidewalk Preparation
Install framing for exterior drywallPolice Building Exterior
Anti-Graffiti Coating on Support BuildingSupport Building Exterior
Installing exterior drywallPolice Building Exterior