Rebar Installation at LPR SiteRebar Installation
2nd Concrete Pour for LPR Building FoundationConcrete Pour
Rebar Installation at Retaining WallRebar Installation
LPR Site Gridline 9-ENDLPR Site
Rebar Installation at Retaining WallRebar Installation
Rebar Installation at Pile CapsRebar Installation
3rd Concrete Pour for LPR Building FoundationConcrete Pour
Below Grade MEP Installation in Building PadBelow Grade MEP
Below Grade Plumbing Installation in Building PadBelow Grade Plumbing
Shooting Shotcrete at Retaining WallShotcrete
Rocking Building Pad: Gridline 1-5LPR Building Pad
Steel Delivered to LPR Site for Steel ErectionSteel Delivery