Fireproofing LPR Structure at Level 2Fireproofing
Stair 2 Installation at LPR Lobby Level 1LPR Park Entry
Concrete Pour at RoofConcrete Pour
Post Concrete Pour at Level 3Post Concrete Pour
Fireproofing Continues and Steel Framing Begins at LPRLPR Exterior
SOG Concrete Pour at Level 1Concrete Pour
Steel Framing at MezzanineSteel Framing
SOG Concrete Pour at Council ChambersConcrete Pour
Steel Framing at Priority Walls on Level 2Steel Framing
Overhead MEPF and Framing in GarageLPR Garage
LPR ExteriorLPR
Pre Parapet Installation at RoofRoof